Skip to product information
1 of 6

invoxia

GPS PRO Tracker - Real-time Location - 1-Year Subscription Included - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life

GPS PRO Tracker - Real-time Location - 1-Year Subscription Included - for Cars, Motorcycles, Bicycles, Children - Motion and Tilt Alerts - 4G LTE-M Network - Up to 3 Months Battery Life

Regular price $193.50 USD
Regular price $193.50 USD Sale price
Shipping calculated at checkout.

Overview

  • Brand : invoxia
  • Special Feature : 4G, LTE-M, Wi-Fi, Bluetooth
  • Connectivity Technology : 4G, Bluetooth, LTE-M
  • Supported Application : Alarm
  • Included Components : Invoxia GPS Tracker, manual, usb cable

About this item

  • INVOXIA GPS PRO - The Invoxia GPS Tracker Pro is the next generation tracker, offering advanced location accuracy thanks to LTE-M connectivity. High performance, with international coverage.
  • LOCATION TRACKING - Offers advanced location tracking for less accessible locations (LTE-M connectivity), with histories and tracks. One-off or permanent export and location sharing functionalities.
  • TRACKING 24/7 - GPS tracker for everyone, everywhere in US in real time. Quick to set up via the app. The tracker is connected to an application that allows you to track in real time.
  • THEFT PREVENTION - Suspicious movement alerts, virtual zones with entry/exit alerts, be notified immediately on your smartphone in the event of attempted theft. Maximizing the chances of recovery.
  • EXCEPTIONAL BATTERY LIFE - GPS tracker device for use with a smartphone, tablet or PC. The battery can last up to 6 months without charging. Position update every 30 seconds. Refillable in 90 minutes
View full details